High pressure systems needed to a deadline for a new residential development

Residential Pressure Boosting System

Description:

Time is money in construction and more then ever delivering and meeting our client’s deadlines was a must for this project.

Our pump expertise was commissioned to design, specify, fabricate/manufacture and install a pumping solution to deliver the drinking water and public health services to the residential blocks in this over-station-development.

Our solution was to design four pressure booster systems. This included a large 6 pump system with Danfoss inverters to pump the mains cold water for the primary block. This system was set to run a pressure of 12.0 bar to ensure that the water would reach the top floor. In order to run the pumps as efficiently as possible, the system was designed to vary the speed of the pumps according to demand.

A complex but interesting pumping challenge – delivered on time and on budget to allow the project to be completed om time.

Scheme Name: Royal Arsenal OSD, Woolwich – New Residential Development
Client: Cilantro Engineering/Berkeley Homes
Completion Date: November 2014
Contract Period: 37 weeks