Case Study: Adoptable Pump Station Delivery at Coast, Burniston

Customer: Mulgrave Properties
Project Name & Location: Coast, Burniston, North Yorkshire
Date: 2024
Water Authority: Yorkshire Water
Housebuilder: Mulgrave Properties – Coast
Photos: Not available

Project Snapshot

Application: Adoptable surface water pumping station
Location: Burniston, North Yorkshire
Water Authority: Yorkshire Water
Status: Adopted with no remedials required
Result: Successfully commissioned and signed off as an excellent example of installation quality

 

Project Overview

Advantage Pumping Solutions was appointed by Mulgrave Properties to deliver an adoptable surface water pumping station at their new residential development in Burniston, North Yorkshire. Designed to manage site drainage effectively and meet adoption standards, the station formed a key element of the development's infrastructure package.

 

Why We Won the Project

Mulgrave Properties selected Advantage for our track record in delivering compliant adoptable systems, our reputation with Yorkshire Water, and our ability to provide expert support from design to handover. With performance, compliance, and ease of adoption key to this project, we were chosen for our:

- In-depth knowledge of Yorkshire Water’s technical expectations

- Reputation for first-time adoption success with no remedial work

- Quality assurance processes built into every phase of the project

 

What We Delivered

Our team supported the full lifecycle of the project—from initial specification and liaison with Yorkshire Water through to final commissioning and adoption. We ensured the pumping station was:

- Fully compliant with DCG and Yorkshire Water addendum requirements

- Delivered and installed to a high standard of workmanship

- Signed off by Yorkshire Water without the need for any remedials

This outcome reflects Advantage’s consistent commitment to delivering pump stations that are not only functional and compliant—but also install-ready and low-risk for adoption.

 

Installation & Timeframe

- Design & Specification: Completed in line with Yorkshire Water requirements

- Installation: Delivered to schedule, meeting build programme milestones

- Commissioning & Adoption: Completed in 2024 with full sign-off and no remedials

 

Challenges We Overcame

While no major technical issues were encountered, Advantage's experience ensured that:

- Design compliance was met from the outset, avoiding costly rework

- Site installation adhered to specification without deviation

- Yorkshire Water’s inspector praised the station as an “excellent example” of best-practice delivery

This smooth process is a direct result of our proactive planning and experienced field teams.

 

Outcome

Advantage’s collaborative approach extended to close coordination with the groundworks team. Through detailed technical input and on-site assistance, we supported the contractor in overcoming installation challenges and maintaining full compliance. The result was a straightforward installation that kept the programme moving and ensured confidence in the final system.

“Signed off with no remedials—an excellent example.”
— Yorkshire Water Inspector (Nick)

Mulgrave Properties benefited from a drainage solution that was delivered right the first time—avoiding delays, additional costs, or post-handover liabilities. Our expertise and attention to detail ensured adoption was straightforward and stress-free.

 

Let's Talk

Want to ensure your pumping station gets signed off without delays or costly remedials?

Contact Advantage Pumping Solutions for expert guidance and proven delivery.