Dual Adoptable Pump Station Delivery at Thornberry Gardens, Dinnington

Customer: Barratt Homes (West Yorkshire)
Project Name & Location: Thornberry Gardens, Lodge Lane, Dinnington, Sheffield, South Yorkshire, S25 2PB
Date: June 2023
Water Authority/NAV: IWNL - Independent Water Networks Limited
Housebuilder: Barratt Homes – Thornberry Gardens

Project Snapshot

Homes Served: 152 dwellings
Location: Dinnington, South Yorkshire
Adoption Body: IWNL
Project Type: Adoptable dual pumping station (foul and surface water)
Status: Completed on time, fully compliant with revised NAV requirements

 

Project Overview

Advantage Pumping Solutions was selected by Barratt Homes to deliver a dual pumping station solution at the Thornberry Gardens development in Dinnington. The project included both a foul water pumping station and a surface water station, serving 152 new homes.

Designed and delivered under the scrutiny of IWNL’s adoptable requirements, the system was engineered to align with updated technical specifications following a mid-project change in adopting authority. The outcome: a robust, NAV-compliant solution delivered on time and within budget.

 

Why We Won the Project

Advantage Pumping Solutions secured this project thanks to our:

  • - Proven technical expertise in adoptable pumping station design
  • - Cost-effective, high-quality solutions aligned to evolving NAV standards
  • - Track record of delivering projects on time and within budget
  • - Strong working relationship with Barratt Homes and key consultants

Our collaborative approach across all stakeholders—including the client, consultants, and roads and sewer contractor—ensured efficient delivery despite specification changes.

 

What We Delivered

The project involved:

  • - Design and delivery of two separate stations: foul and surface water
  • - Full technical compliance with IWNL adoption requirements
  • - Seamless transition from initial approval through to installation and commissioning
  • - Ongoing collaboration with Barratt Homes, the consultant, and the wider project team

Installation and commissioning were completed within the agreed timeframe, ensuring the development programme stayed on track.

 

Installation & Timeframe

  • Design & Coordination: Throughout 2022–early 2023
  • Installation & Commissioning: Completed by June 2023
  • Outcome: On-time delivery with full compliance to revised IWNL specifications

 

Challenges We Overcame

  • Adopting Authority Change: The site transitioned mid-project to IWNL, requiring revised designs and technical submissions.
  • Multi-Stakeholder Coordination: Maintaining consistent communication between commercial teams, contractors, and consultants was essential.

 