Adoptable Pump Station Delivery at Witheridge Phase 2, Devon

Customer: Allison Homes SW Limited
Project Name & Location: Witheridge Phase 2, Devon
Date: November 2023
Water Authority: IWNL – Independent Water Networks Limited
Housebuilder: Allison Homes SW Limited

Project Overview

Advantage Pumping Solutions was appointed by Allison Homes SW Limited to design and deliver an adoptable foul water pumping station for the Witheridge Phase 2 residential development in Devon.

Designed in accordance with the latest IWNL addendum to the Design and Construction Guidance (DCG), the pumping station forms a critical part of the site’s foul drainage infrastructure, providing reliable wastewater management for 56 new homes while ensuring compliance with adoptable standards.

Download the Full Case Study

Discover how Advantage Pumping Solutions developed a compliant adoptable foul water pumping station design for 56 new homes, including the technical challenges, evolving drainage requirements, hydraulic design solutions and considerations for future IWNL adoption.

Download The Full Case Study Adoptable Pump Station Delivery at Witheridge

This field is for validation purposes and should be left unchanged.
Name(Required)
Email(Required)