Adoptable pumping station support for Independent Water Networks Ltd developments

Where Independent Water Networks Ltd (IWNL) is the wastewater NAV for a development, the pumping station needs to be designed not only around the requirements of the site, but around IWNL's own technical approval and adoption process.

Advantage Pumping Solutions works with developers, consultants, groundworkers and NAVs to make that process as straightforward as possible.

Our established experience of working with IWNL means our team understands what needs to be considered at design stage, how the pumping station fits into the wider Section 104 process and what information will be required as the project moves towards commissioning and adoption.

Understanding IWNL pumping station requirements

IWNL adopts, owns and operates water and wastewater networks across England and Wales through the NAV process. It states that it can serve developments within areas otherwise served by incumbent regional water companies.

For adoptable pumping stations, IWNL has a dedicated Adoptable Pumping Station Design Guide.

Its current guidance states that pumping-station adoption needs to be included within the commercial agreement and that IWNL does not currently adopt a pumping station where a site serves fewer than 100 plots. The detailed pumping-station design is then submitted to IWNL for technical review as part of the Section 104 process.

The design is expected to follow the Water UK Sewerage Sector Guidance and Design and Construction Guidance together with IWNL's own requirements.

An established relationship helps remove friction

This is where Advantage's experience becomes particularly valuable.

Rather than approaching IWNL requirements for the first time on each development, our team can draw on its existing experience and working relationships to help ensure the pumping-station package is developed around the information and standards expected by the NAV.

That can help reduce repeated technical queries and avoid important requirements being identified only after the civil design or equipment specification has progressed.

How Advantage can support your IWNL project

We can assist with:

•  Early pumping-station feasibility and design

•  Hydraulic calculations

•  Pump selection

•  Full mechanical and electrical design

•  IWNL technical-review information

•  Compound and pumping-station layouts

•  Rising-main design information

•  Pump-performance information

•  Telemetry requirements

•  Equipment manufacture and supply

•  Installation and commissioning

•  Technical support through inspection and adoption

IWNL's current process includes technical review, construction inspections, commissioning, a maintenance period and finally vesting of the asset.

Advantage can remain involved throughout that journey rather than disappearing once the equipment has been supplied.

IWNL pumping station FAQs

Does IWNL adopt pumping stations?

Yes, subject to its commercial and technical requirements. IWNL currently states that pumping-station adoption is available where the site serves more than 100 plots.

Does IWNL have its own pumping-station specification?

Yes. IWNL publishes an Adoptable Pumping Station Design Guide in addition to the national Design and Construction Guidance.

Can Advantage help with an IWNL technical submission?

Yes. We can develop the pumping-station design and supporting technical information and work with the wider project team as the station progresses towards technical approval and adoption.

Planning an IWNL pumping station?

Use Advantage's experience of working with IWNL to help simplify the process from design through to adoption.

Discuss My IWNL Project

Tell Us About Your NAV Project

This field is for validation purposes and should be left unchanged.
Name(Required)
Email(Required)
Please choose NAV(Required)
New or Existing Enquiry
Please let us know what's on your mind. Have a question for us? Ask away.